Evolutions
![calender5 2005](https://www.kohinoormetallics.com/wp-content/uploads/2021/03/calender5-40x40.png)
2005
Foundry with PINLIFT Moulding machine and mannual process established.
![calender5 2007](https://www.kohinoormetallics.com/wp-content/uploads/2021/03/calender5-40x40.png)
2007
Foundry with PINLIFT Moulding machine and mannual process established.
![calender5 2009](https://www.kohinoormetallics.com/wp-content/uploads/2021/03/calender5-40x40.png)
2009
Pneutmatic moulding machine & intensive sand mixer for sand and moulding quality were installed.
![calender5 2012](https://www.kohinoormetallics.com/wp-content/uploads/2021/03/calender5-40x40.png)
2012
Semi sand plant and shot blasting machines were installed.
![calender5 2013](https://www.kohinoormetallics.com/wp-content/uploads/2021/03/calender5-40x40.png)
2013
Machining facilities established with installation of two CNC and one VMC machines.
![calender5 2014](https://www.kohinoormetallics.com/wp-content/uploads/2021/03/calender5-40x40.png)
2014
Third CNC machine installed.
![calender5 2015](https://www.kohinoormetallics.com/wp-content/uploads/2021/03/calender5-40x40.png)
2015
Fourth CNC machine installed.
![calender5 2016](https://www.kohinoormetallics.com/wp-content/uploads/2021/03/calender5-40x40.png)
2016
Fifth CNC machine one turn mill center two VMC with 4th axis installed.
2017
Introduction furnace ( 550Kw, 550Kg, make inductotherm installed.)
2018
Spectrometer ( German Company)
2019
Fully automated sand plant installed.
ARPA 450 & ARPA 300 were installed.
Box sizes 24*28 & 20*22
ARPA 450 & ARPA 300 were installed.
Box sizes 24*28 & 20*22